SLURRY PIPELINE FOR KHOURIBGA MINE IN JORF LASFAR

LOCATION
Khouribga - Jorf Lasfar, Morocco

CLIENT
OCP S.A

CONTRACTOR
Tekfen Construction and Installation Co., Inc.

COMMENCEMENT
January 2011

COMPLETION
Continuous

Tekfen Engineering is performing detailed engineering in all disciplines, particularly civil, structural, architectural, piping, design and low voltage electrical installation designs, instrumentation and controls per the detailed split of work. Procurement support engineering (MR’s and technical evaluation of certain packages). Construction support engineering (Field Engineering). Pipeline alignment design (typical cross-section drawings, alignment sheets and crossing detailed drawings). Storage tanks design.

The Scope of Work for the Engineering services of the pipeline systems comprise:

  • Main slurry pipeline (287 Km)
  • Feeder slurry pipelines (Total 39 Km)
  • Head Pump Station
  • Daoui Pump Station
  • El Halassa Pump Station
  • MEA Station
  • Valve station (VS1)
  • Pressure Monitoring Stations (PMS 1,2,3 and 4)
  • Terminal station
  • Fresh water pipeline (5 Km)