SAMIR REFINERY UPGRADING PROJECTS

Client:

Samir

Location:

Morocco

Year:

2011-2015

PROJECT DETAILS

The objectives of the upgrade scheme is :

  • Process of 1,22 million tons of atmospheric residue
  • Decreasing the proportion of the heavy oil production by upgrading the heavy oil to valuable middle distillate products
  • Improving quality of distillate fuel products

SCOPE OF SERVICES

Engineering : Detailed engineering for all civil works and offsite piping

Procurement : All civil, steel structure, painting, insulation material

Construction : All construction works

Fabrication  : Steel structures, pipe spools and pipe supports

Pre-Comm. & Comm. : Assistance by providing manpower and equipment

The Major Elements:

  • Vacuum Distillation Unit  : 54.300 bpsd (360 m3/h)
  • Distillates Hydrotreater Unit : 55.000 bpsd (364 m3 /h)
  • Hydrocracker Unit  : 36.000 bpsd (239 m3 /h)
  • Hydrogen Production Unit  : 102.000 Nm3 /h (220 TPD)
  • Sulphur Recovery Unit  : 253 TPD per train (2 trains)