SAMIR REFINERY UPGRADING PROJECTS
Client:
Samir
Location:
Morocco
Year:
2011-2015
PROJECT DETAILS
The objectives of the upgrade scheme is :
- Process of 1,22 million tons of atmospheric residue
- Decreasing the proportion of the heavy oil production by upgrading the heavy oil to valuable middle distillate products
- Improving quality of distillate fuel products
SCOPE OF SERVICES
Engineering : Detailed engineering for all civil works and offsite piping
Procurement : All civil, steel structure, painting, insulation material
Construction : All construction works
Fabrication : Steel structures, pipe spools and pipe supports
Pre-Comm. & Comm. : Assistance by providing manpower and equipment
The Major Elements:
- Vacuum Distillation Unit : 54.300 bpsd (360 m3/h)
- Distillates Hydrotreater Unit : 55.000 bpsd (364 m3 /h)
- Hydrocracker Unit : 36.000 bpsd (239 m3 /h)
- Hydrogen Production Unit : 102.000 Nm3 /h (220 TPD)
- Sulphur Recovery Unit : 253 TPD per train (2 trains)