ANKARA METRO STAGE III (BATIKENT - SİNCAN - TÖREKENT LINE) PRE-FINAL AND FINAL DESIGN

Client:

Ankara Metropolitan Municipality

Güriş Construction and Engineering Co. Inc.

Location:

Ankara / TURKEY

Year:

2001-2004

PROJECT DETAILS

  • 15.6 km Metro Line
  • 2 X 1 km Tunneling with EPB TBM
  • Viaducts with a Total Length of 3 km
  • 12 Stations (At Grade, Cut & Cover, Viaduct)

SCOPE OF SERVICES

  • Alignment Design (Sc: 1/1.000)
  • Architectural - Structural - Electrical - Mechanical Design of Stations
  • Bridges, Viaducts, Tunnels and Cut & Cover Structures Design
  • Geotechnical Design
  • Drainage Design
  • Trackworks Design
  • As-Built Drawings