ANKARA METRO STAGE III (BATIKENT - SİNCAN - TÖREKENT LINE) PRE-FINAL AND FINAL DESIGN
Client:
Ankara Metropolitan Municipality
Güriş Construction and Engineering Co. Inc.
Location:
Ankara / TURKEY
Year:
2001-2004
PROJECT DETAILS
- 15.6 km Metro Line
- 2 X 1 km Tunneling with EPB TBM
- Viaducts with a Total Length of 3 km
- 12 Stations (At Grade, Cut & Cover, Viaduct)
SCOPE OF SERVICES
- Alignment Design (Sc: 1/1.000)
- Architectural - Structural - Electrical - Mechanical Design of Stations
- Bridges, Viaducts, Tunnels and Cut & Cover Structures Design
- Geotechnical Design
- Drainage Design
- Trackworks Design
- As-Built Drawings