AYDIN – KUYUCAK MOTORWAY PRELIMINARY AND FINAL DESIGN
Client:
KGM – General Directorate of Highways
Location:
Aydın / TURKEY
Year:
1997-2007
PROJECT DETAILS
- 60 km 2×3 Motorway, 10 km 2×3 Expressway, 5 km 2×2 Access Road
- 4 Interchanges, 5 Intersections
- 6 Viaducts
- 26 Underpass and Overpass Bridges
SCOPE OF SERVICES
- Corridor Study (Sc: 1/25.000)
- Aerial Survey
- Alignment Design (Sc: 1/5.000 – 1/1.000 ), Including Interchanges & Intersections
- Hydrological and Drainage Design
- Culverts, Bridges and Viaducts Structural Design
- Soil Investigations and Geotechnical Design
- Traffic Demand Forecast & Feasibility Reports and Tender Documents