AYDIN - KUYUCAK MOTORWAY PRELIMINARY AND FINAL DESIGN

Client:

KGM - General Directorate of Highways

Location:

Aydın / TURKEY

Year:

1997-2007

PROJECT DETAILS

  • 60 km 2x3 Motorway, 10 km 2x3 Expressway, 5 km 2x2 Access Road
  • 4 Interchanges, 5 Intersections
  • 6 Viaducts
  • 26 Underpass and Overpass Bridges

SCOPE OF SERVICES

  • Corridor Study (Sc: 1/25.000)
  • Aerial Survey
  • Alignment Design (Sc: 1/5.000 - 1/1.000 ), Including Interchanges & Intersections
  • Hydrological and Drainage Design
  • Culverts, Bridges and Viaducts Structural Design
  • Soil Investigations and Geotechnical Design
  • Traffic Demand Forecast & Feasibility Reports and Tender Documents