BAKIRKÖY – BEYLİKDÜZÜ METRO LINE TENDER DESIGN
Client:
İBB – İstanbul Metropolitan Municipality
Location:
İstanbul / TURKEY
Year:
2005-2008
PROJECT DETAILS
- 25.2 km Metro Line
- 2 X 15.2 km Tunneling with EPB TBM
- 3 Viaducts with a Total Length of 2.7 km
- 16 Cut & Cover, 1 At Grade, 1 Viaduct Stations, Depot Area
SCOPE OF SERVICES
- Corridor Study
- Alignment Design (Sc: 1/1.000)Architectural – Structural – Electrical – Mechanical Design of Stations
- Bridges, Viaducts and Tunnels Structural Design
- Soil Investigations and Geotechnical Design
- Electro-Mechanical Design
- Traffic Demand Forecast, Feasibility & EIA Reports and Tender Documents