BAKIRKÖY İDO - KİRAZLI METRO LINE TENDER DESIGN
Client:
İBB - İstanbul Metropolitan Municipality
Location:
İstanbul / TURKEY
Year:
2005-2008
PROJECT DETAILS
- 8.9 Km Metro Line
- 2 X 6.8 Km Tunneling With EPB TBM And 2 X 0.2 Km NATM Tunneling
- 7 Cut & Cover Underground, 1 Tunnel Stations
SCOPE OF SERVICES
- Corridor Study
- Alignment Design (Sc: 1/1.000)
- Architectural - Structural - Electrical - Mechanical
Design of Stations
- Tunnels Design
- Soil Investigations and Geotechnical Design
- Electro-Mechanical Design
- Traffic, Demand Forecast, Feasibility & EIA Reports And Tender Documents