BODRUM RING ROAD PRELIMINARY AND FINAL DESIGN
Client:
KGM – General Directorate of Highways – II.Division
Location:
Muğla / TURKEY
Year:
2018-Ongoing
PROJECT DETAILS
- 18.6 km 2×2 Expressway
- 4 Interchanges
- 4 Tunnels with Total Length Of 5.6 km
- Viaducts
SCOPE OF SERVICES
- Corridor Study (Sc: 1/25.000)
- Aerial Survey
- Alignment Design (Sc: 1/1.000), Including Interchanges
- Hydraulic & Hydrological and Drainage Design
- Bridges, Viaducts and Tunnels Structural Design
- Traffic Safety Study and Sign & Marking Design
- Soil Investigations and Geotechnical Design, Pavement Design

