BODRUM RING ROAD PRELIMINARY AND FINAL DESIGN

Client:

KGM - General Directorate of Highways - II.Division

Location:

Muğla / TURKEY

Year:

2018-Ongoing

PROJECT DETAILS

  • 18.6 km 2x2 Expressway
  • 4 Interchanges
  • 4 Tunnels with Total Length Of 5.6 km
  • Viaducts

SCOPE OF SERVICES

  • Corridor Study (Sc: 1/25.000)
  • Aerial Survey
  • Alignment Design (Sc: 1/1.000), Including Interchanges
  • Hydraulic & Hydrological and Drainage Design
  • Bridges, Viaducts and Tunnels Structural Design
  • Traffic Safety Study and Sign & Marking Design
  • Soil Investigations and Geotechnical Design, Pavement Design