(BURSA - KARACABEY) INT. - ZEYTİNBAĞI - MUDANYA ROAD PRELIMINARY AND FINAL DESIGN

Client:

KGM - General Directorate of Highways

Location:

Bursa / TURKEY

Year:

2015-2018

PROJECT DETAILS

  • 8 km 2x2, 22 km 2x1 Expressway
  • 2 Interchanges
  • 8 Intersections
  • 2 Bridges

SCOPE OF SERVICES

  • Corridor Study (Sc: 1/25.000)
  • Land Survey
  • Alignment Design (Sc: 1/1.000), Including Interchanges & Intersections
  • Hydraulic & Hydrological and Drainage Design
  • Culverts, Bridges Structural Design
  • Traffic Safety and Sign & Marking Design
  • Soil Investigations and Geotechnical Design, Pavement Design