(BURSA - KARACABEY) INT. - ZEYTİNBAĞI - MUDANYA ROAD PRELIMINARY AND FINAL DESIGN
Client:
KGM - General Directorate of Highways
Location:
Bursa / TURKEY
Year:
2015-2018
PROJECT DETAILS
- 8 km 2x2, 22 km 2x1 Expressway
- 2 Interchanges
- 8 Intersections
- 2 Bridges
SCOPE OF SERVICES
- Corridor Study (Sc: 1/25.000)
- Land Survey
- Alignment Design (Sc: 1/1.000), Including Interchanges & Intersections
- Hydraulic & Hydrological and Drainage Design
- Culverts, Bridges Structural Design
- Traffic Safety and Sign & Marking Design
- Soil Investigations and Geotechnical Design, Pavement Design