MALKARA - ÇANAKKALE MOTORWAY AND 1915 ÇANAKKALE BRIDGE SUPERVISION AND CONSULTANCY
Client:
KGM - General Directorate of Highway
Location:
Çanakkale / TURKEY
Year:
2017-Ongoing
PROJECT DETAILS
Tekfen Engineering is providing design and construction supervision services for 1915 Canakkale Suspension Bridge, having the longest main span with 2023 with the record breaking 2023 m main span and 88 km motorway dual three.
- 3.6 km Suspension Bridge - 2023 m Main Span Length
- 88 km Motorway, 10 km Access Roads
- 12 Interchanges
- 4 Viaducts, 64 Underpass and Overpass Bridges
SCOPE OF SERVICES
- Supervision of BOT Type of Work
- Supervision of Final Design Carried Out by the Contractor
- Supervision of Civil And Electro-Mechanical Works
- Consultancy to the Client