MALKARA - ÇANAKKALE MOTORWAY AND 1915 ÇANAKKALE BRIDGE SUPERVISION AND CONSULTANCY

Client:

KGM - General Directorate of Highway

Location:

Çanakkale / TURKEY

Year:

2017-Ongoing

PROJECT DETAILS

Tekfen Engineering is providing design and construction supervision services for 1915 Canakkale Suspension Bridge, having the longest main span with 2023 with the record breaking 2023 m main span and 88 km motorway dual three.

  • 3.6 km Suspension Bridge - 2023 m Main Span Length
  • 88 km Motorway, 10 km Access Roads
  • 12 Interchanges
  • 4 Viaducts, 64 Underpass and Overpass Bridges

SCOPE OF SERVICES

  • Supervision of BOT Type of Work
  • Supervision of Final Design Carried Out by the Contractor
  • Supervision of Civil And Electro-Mechanical Works
  • Consultancy to the Client