ÇANAKKALE - SAVAŞTEPE MOTORWAY PRELIMINARY AND TENDER DESIGN FOR BOT
Client:
KGM - General Directorate of Highways
Location:
Çanakkale / TURKEY
Year:
2010-2016
PROJECT DETAILS
- 139 km 2x3 Motorway, 13 km 2x2 Access Road
- 11 Interchanges
- 23 Viaducts (11 Balanced Cantilever, 12 Precast Beam) and 4 Tunnels
- 88 Underpass and Overpass Bridges
SCOPE OF SERVICES
- Corridor Study (Sc: 1/25.000)Aerial Survey
- Alignment Design (Sc: 1/5.000), Including Interchanges
- Hydraulic & Hydrological Study
- Culverts, Bridges, Viaducts and Tunnels Structural Design
- Soil Investigations and Geotechnical Design
- Traffic Demand Forecast & Feasibility Reports and Tender Documents