ÇİFTEHAN - POZANTI MOTORWAY VIADUCTS AND TUNNELS FINAL DESIGN

Client:

KGM - General Directorate of Highways


Tekfen Construction and Installation Co., Inc.

Location:

Niğde-Adana / TURKEY

Year:

2000-2008

PROJECT DETAILS

  • 2 NATM Tunnels - 2 X 1180 m, 2 X 1130 m
  • 12 Viaducts with Total Length of 14232 m

SCOPE OF SERVICES

  • Viaducts Structural Design
  • Tunnels Geotechnical and Structural Design