KABATAŞ - MECİDİYEKÖY - MAHMUTBEY METRO LINE TENDER DESIGN

Client:

İBB - İstanbul Metropolitan Municipality

Location:

İstanbul / TURKEY

Year:

2005-2009

PROJECT DETAILS

  • 23.9 km Metro Line
  • 2 X 17.1 km Tunneling With EPB TBM and 2 X 1.3 Km NATM Tunneling
  • 2 Viaducts with A Total Length Of 1.4 km
  • 5 Cut & Cover, 11 Tunnel, 2 Viaduct Stations, Depot Area

SCOPE OF SERVICES

  • Corridor Study
  • Alignment Design (Sc: 1/1.000)Architectural - Structural - Electrical - Mechanical Design of Stations
  • Bridges, Viaducts and Tunnels Design
  • Soil Investigations and Geotechnical Design
  • Electro-Mechanical Design
  • Traffic Demand Forecast, Feasibility & EIA Reports And Tender Documents