İSTANBUL METRO PHASE – 1, MECİDİYEKÖY – 4TH LEVENT SECTION FINAL DESIGN
Client:
İBB – İstanbul Metropolitan Municipality
Tekfen Construction and Installation Co., Inc.
Location:
İstanbul / TURKEY
Year:
1993-2000
PROJECT DETAILS
- 3.5 Km Metro Line
- 2 X 3.2 Km NATM Tunneling
- 2 Cut & Cover, 1 Tunnel Stations
SCOPE OF SERVICES
- Architectural – Structural – Electrical – Mechanical Design of Stations
- Tunnels Structural Design
- Geotechnical Design
