MERZİFON - KOYULHİSAR MOTORWAY PRELIMINARY AND TENDER DESIGN FOR BOT
Client:
KGM - General Directorate of Highways
Location:
Amasya-Sivas / TURKEY
Year:
2013-Ongoing
PROJECT DETAILS
- 235 km 2x3 Motorway
- 7 Interchanges
- 47 Viaducts and 29 Tunnels
- 72 Underpass and Overpass Bridges
SCOPE OF SERVICES
- Corridor Study (Sc: 1/25.000)
- Aerial Survey
- Alignment Design (Sc: 1/5.000), Including Interchanges
- Hydrological Study
- Culverts, Bridges, Viaducts and Tunnels Structural Design
- Soil Investigations and Geotechnical Design
- Traffic Demand Forecast, Feasibility & EIA Reports and Tender Documents