MUĞLA – KALE STATE HIGHWAY PRELIMINARY AND FINAL DESIGN
Client:
KGM – General Directorate of Highways – II.Division
Location:
Muğla / TURKEY
Year:
2017-Ongoing
PROJECT DETAILS
- 22 Km 2×2 Expressway
- 6 Interchanges
- 2 Underpasses and Overpass Bridges
- 2 Tunnels
SCOPE OF SERVICES
- Corridor Study (Sc: 1/25.000)Aerial Survey
- Alignment Design (Sc: 1/1.000), Including Interchanges
- Hydraulic & Hydrological and Drainage Design
- Bridges, Viaducts and Tunnels Structural Design
- Traffic Safety and Sign & Marking Design
- Soil Investigations and Geotechnical Design, Pavement Design

