PORT SUDAN NEW STRATEGIC DEPOT PROJECT

Client:

Sudanese Petroleum Corporation

Location:

SUDAN

Year:

2012-2013

PROJECT DETAILS

Sudanese Petroleum Corporation (SPC) invested on construction of a new strategic storage for gas oil, gasoline, Jet A1 and LPG with related facilities at Portsudan City.

  • Above ground storage vertical tanks & LPG spherical tanks
  • Pipelines and piping system
  • Metering system (loading and unloading)
  • Fire fighting system
  • Product transfer pumps
  • Loading gantries
  • Electrical, instrumentation & control system
  • Power generators
  • Clean water, industrials and sewage drain systems
  • Civil works (buildings, sheds, roads, etc.)

SCOPE OF SERVICES

  • Design of 15 km transfer pipeline from port facility to depot
  • Basic and detailed design of the LPG system within the storage area
  • All civil/structural design
  • Preparation of PFD and PID for the LPG
  • HAZOP
  • Fire fighting and fire detection system
  • Design of pump station, compressor station, metering system
  • Underground drainage system