SUSURLUK – BALIKESİR MOTORWAY PRELIMINARY AND FINAL DESIGN
Client:
KGM – General Directorate of Highways
Location:
Balıkesir / TURKEY
Year:
- Preliminarry Design Services (1993-1995)
- Final Design Services (1997-2001)
PROJECT DETAILS
- 62 km 2×3 Motorway
- 6 Interchanges, 6 Intersections
- 5 Viaducts
- 3 Underpass and Overpass Bridges
SCOPE OF SERVICES
- Corridor Study (Sc: 1/25.000)
- Land Survey
- Alignment Design (Sc: 1/5.000 – 1/1.000 ), Including Interchanges & Intersections
- Hydraulic & Hydrological and Drainage Design
- Culverts, Bridges and Viaducts Structural Design
- Soil Investigations and Geotechnical Design
- Traffic Demand Forecast, Feasibility Reports and Tender Documents