SUSURLUK - BALIKESİR MOTORWAY PRELIMINARY AND FINAL DESIGN

Client:

KGM - General Directorate of Highways

Location:

Balıkesir / TURKEY

Year:

  • Preliminarry Design Services (1993-1995)
  • Final Design Services (1997-2001)

PROJECT DETAILS

  • 62 km 2x3 Motorway
  • 6 Interchanges, 6 Intersections
  • 5 Viaducts
  • 3 Underpass and Overpass Bridges

SCOPE OF SERVICES

  • Corridor Study (Sc: 1/25.000)
  • Land Survey
  • Alignment Design (Sc: 1/5.000 - 1/1.000 ), Including Interchanges & Intersections
  • Hydraulic & Hydrological and Drainage Design
  • Culverts, Bridges and Viaducts Structural Design
  • Soil Investigations and Geotechnical Design
  • Traffic Demand Forecast, Feasibility Reports and Tender Documents