TARSUS - ADANA - GAZİANTEP MOTORWAY PRELIMINARY AND FINAL DESIGN
Client:
KGM - General Directorate of Highways
Tekfen - Impresit Joint Venture
Location:
Tarsus-Adana-Gaziantep / TURKEY
Year:
1988-1992
PROJECT DETAILS
TAG Motorway is a project in scope of TEM (Trans European Motorway/E-Network) network, which connects Europe to Middle East. The project is a milestone for Tekfen Engineering by being the first motorway design in Turkey without any JV with a foreign company. Moreover, via this project, the foundations of Transportation and Infrastructure Department were laid.
- 230 km 2x3 Motorway
- 17 Interchanges
- 14 Viaducts with a Total Length of 5.232 m
- 5 Tunnels with a Total Length of 5.352 m
SCOPE OF SERVICES
- Corridor Study (Sc: 1/25.000)
- Land Survey
- Alignment Design (Sc: 1/1.000), Including Interchanges
- Hydraulic & Hydrological and Drainage Design
- Culverts, Bridges, Viaducts and Tunnels Geotechnical and Structural Design
- Traffic Safety and Sign & Marking Design
- Soil Investigations and Geotechnical Design, Pavement Design