TRANS ANATOLIAN NATURAL GAS PIPELINE

Client:

Tekfen Construction and Installation Co., Inc.

Location:

TURKEY

Year:

2016-2019

PROJECT DETAILS

The TANAP starts from the Georgia/Turkey border at

Türkgözü/Posof/Ardahan where it connects to South Caucasus Pipeline (SCP) and ends at the Turkey/Greece border in Ipsala/Edirne, where it feeds into the TAP Pipeline. There is an off-take station at Eskisehir, Turkey, and another one at Thrace, Turkey to connect to the Turkish natural gas distribution network.

SCOPE OF SERVICES

  • Civil Engineering
  • Structural Design
  • Architectural Design
  • Mechanical Design including piping stress checks and isometric generation
  • Procurement support engineering (MR’s and technical evaluation of certain packages)
  • Fire Fighting and utilities design
  • 3D Model Development and Technical Endorsement
  • Field Engineering

Project Configuration

  • MS1 - Fiscal Metering Station
  • CS1 - Compressor Station
  • MS2 - Metering Station
  • CS5 - Compressor Station
  • CS5 - Offtake
  • MS3 - Metering Station
  • MS4 - Fiscal Metering Station