TÜPRAŞ KIRIKKALE REFINERY NEW POWER PLANT PROJECT
Client:
TÜPRAŞ
Location:
Kırıkkale / TURKEY
Year:
2014-2016
PROJECT DETAILS
- Export to refining complex a net power of 40MWe
- Medium and low pressure steam to be sent to refiner’s headers
- Importing from and exporting to national grid to be an option due to operational conditions.
SCOPE OF SERVICES
- H&M Balances, PFD and P&ID development, Utility requirements
- Plot Plan development and optimize plant layout to fit 155m x 170m area
- Static and rotating equipment design
- Piping systems (Pipe stress analysis, piping plan and layouts, pipe specs and classes, isometrics)
- Civil and structural engineering design including heavy duty foundations
- Electrical Systems (SLD, Operation Modes, specifications and layouts)
- Instrumentation and Control (Logic diagrams, control philosophy, I/O lists)
- Architectural design including ergonomic designü
- HAZOP / SIL Study
- Operation Manuals
CONFIGURATION OF THE PROJECT
- One aeroderivative gas turbine (GT LM6000 (40MWe) to be relocated to the facility from another location)
- One Heat Recovery Steam Generator (HRSG)
- One Conventional Boiler
- One back-pressure steam turbine (Siemens SST-600, 16MWe)
- One condensing steam turbine (STG 3 existing turbine (20MWe) within the refinery to be re-located to the new power plant)
- New Turbine Hall Building
- New Central Control Building
- New Substation Building