TÜPRAŞ KIRIKKALE REFINERY CDU / VDU REVAMP

Client:

Turkish Petroleum Refineries Co., Inc. (TÜPRAŞ)

Location:

Kırıkkale / TURKEY

Year:

2012-2015

PROJECT DETAILS

Aim was to increase the energy efficiency in CDU plant and to increase the capacity in VDU plant from 4800 to 6000 m3/day. Main modifications were;

  • Addition of a new pump around in CDU (new pump, exchanger and column modification)
  • Tube layout modifications in VDU Furnace
  • New pumps for capacity increase
  • New kettle type heat exchangers to enhance steam generation

SCOPE OF SERVICES

  • Consistency check of Basic Design Engineering Package
  • Plot plan, piping, stress analysis, structural design, infrastructure
  • P&ID, PFD preparation, HAZOP, Process datasheets, cause and effect diagrams
  • I&C design, instrument datasheet and schedules
  • Electrical design ü Equipment design, mechanical datasheets
  • Procurement work (MR, MTO), evaluation of vendor documents
  • Civil and Structural design
  • Construction Planning