ÜNYE RING ROAD PRELIMINARY AND FINAL DESIGN

Client:

KGM - General Directorate of Highways

Location:

Ordu / TURKEY

Year:

1999-2005

PROJECT DETAILS

  • 14 km 2x2 Expressway
  • 4 Interchanges
  • 2 Tunnels

SCOPE OF SERVICES

  • Land Survey
  • Alignment Design (Sc: 1/1.000), Including Interchanges
  • Hydraulic & Hydrological and Drainage Design
  • Tunnels Geotechnical and Structural Design
  • Traffic Safety and Sign & Marking Design
  • Soil Investigations and Geotechnical Design, Pavement Design