YENİBOSNA- SEFAKÖY – AVCILAR – BEYLİKDÜZÜ LRT LINE PRELIMINARY DESIGN
Client:
İBB – İstanbul Metropolitan Municipality
Location:
İstanbul / TURKEY
Year:
2001-2004
PROJECT DETAILS
- 24.5 km Metro Line
- 2 X 9.6 km Tunneling With EPB TBM
- 3 Viaducts with a Total Length of 4.9 km
- 11 Cut & Cover,1 At Grade, 3 Viaduct Stations, Depot Area
SCOPE OF SERVICES
- Corridor Study
- Alignment Design (Sc: 1/1.000)
- Architectural – Structural – Electrical – Mechanical Design of Stations
- Bridges, Viaducts, Tunnels and Cut & Cover Structures Design
- Soil Investigations and Geotechnical Design
- Electro-Mechanical Design
- Traffic Demand Forecast, Feasibility Reports and Tender Documents