YUNAK – KGM 4TH REGIONAL DIRECTORATE BORDER STATE ROAD PRELIMINARY AND FINAL DESIGN
Client:
KGM – General Directorate of Highways
Location:
Konya / TURKEY
Year:
2019-Ongoing
PROJECT DETAILS
- 39 km 2×2 Expressway
- 12 Intersections
SCOPE OF SERVICES
- Land Survey
- Alignment Design (Sc: 1/1.000), Including Intersections
- Hydraulic & Hydrological and Drainage Design
- Highway Structures Structural Design
- Traffic Safety and Sign & Marking Design
- Soil Investigations and Geotechnical Design, Pavement Design