YUNAK – KGM 4TH REGIONAL DIRECTORATE BORDER STATE ROAD PRELIMINARY AND FINAL DESIGN
Client:
Kgm – General Directorate Of Highways
Location:
Konya / TURKEY
Year:
2019 – Cont.
PROJECT DETAILS
- 39 Km 2×2 Expressway
- 12 Intersections
SCOPE OF SERVICES
- Land Survey
- Alignment Design (Sc: 1/1.000), Including Intersections
- Hydraulic & Hydrological And Drainage Design
- Higway Structures Structural Design
- Traffic Safety And Sign & Marking Design
- Soil Investigations And Geotechnical Design, Pavement Design
