SHAH DENİZ STAGE 2, ONSHORE TERMINAL PROJECT

Client:

BP Azerbaijan

Location:

Azerbaijan

Year:

2014-2018

PROJECT DESCRIPTION

Shah Deniz Stage 2 Onshore Terminal Facility will be constructed at Sangahcal Terminal, located 45 km. South of Baku city centre. The scope of work associated with the above facilities will include civil engineering work, piling, foundations, underground and open drainage systems, terminal access and internal roads, process equipment, storage tanks including design, pipe racks, piping, electrical and control systems construction and installation activities.

SCOPE OF WORK

Engineering :

  • Permanent Buildings, Temporary facilities
  • Condensate Storage Tanks (2 pcs)
  • Produced Water Storage Tank
  • Off-Spec Condensate Tank
  • Open Drains Holding Tank
  • Fire Water Storage Tank
  • Rich MEG & Lean MEG Tank
  • Steelwork Fabrication Drawings Preparation (18.000 t)

All coordination and site engineering works

Manufacturing :

  • 6.127 m3 firewater holding tank
  • 6.184 m3 ea. meg tank
  • 7.056 m3 rich meg tank
  • 11.247 m3 off spec tank
  • 38.330 m3 produced water tank
  • 3.987 m3 open drains holding tank
  • 48.373 m3 condensate tanks (2 each)

Construction:

  • Onshore Gas and Condensate Processing Plant
  • Power Generation, Storage Tanks, Utilities
  • Telecommunications and Control Room
  • Onsite Buildings, Onshore pipelines
  • Brownfield Works, Temporary Facilities